Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Mee Blog

All Blogs

Latest Articles

Energy Efficient MeeFog System Allows Amherst College to Humidify the New Science Center

Case Study: Humidification for AHU’s 1-4 & 6. Evaporative cooling for HRU’s 1-4. Consisting of one pump...

Iowa State University Builds the First Gold LEED Certified Chemistry Laboratory

Case Study: In 2011, ISU’s Hach Hall became the first chemistry building in the country to achieve...

Our Solution: Steam Condenser Pre-cooling

Case Study: A combined cycle power plant uses exhaust heat to make steam, the steam is run...

AC Condenser Pre-Cooling System Provides 16-Month Return on Investment

Project Profile: A circuit board manufacturer in Mexico installed pre-cooling on two York condensers.

Gas Turbine Inlet Air Fogging on Two SW 501FD2 GTs

Project Profile: A Southwestern US Power Station installed MeeFog Systems on two SW 501FD2 gas turbines.

Adding Wet Compression to Existing Fog System Eagle Point Power Generation – Westville, NJ

Case Study: Eagle Point Power Generation (EPPG) in Westville, NJ is a 225 MW combined-cycle facility with...

MeeFog Cooling System Rapid ROI Pays for Additional Cooling Power

Case Study: Midland Cogeneration Venture needed a cost-effective way to boost output at their facility. Mee Industries...

Grand River Hospital Gains a Chemical-Free Humidification Solution

Blog: Fog uses clean water from an RO system and saves energy compared to direct steam injection.

Meefog System Gives Watson Cogen an Extra 10MW

Blog: No fog-related blade erosion in 20 years of operation any time the ambient temperature is above...