AC Condenser Pre-Cooling System Provides 16-Month Return on Investment
Project Profile: A circuit board manufacturer in Mexico installed pre-cooling on two York condensers.
Existing Customers Call 626-359-4550 Or Visit Customer Care
Project Profile: A circuit board manufacturer in Mexico installed pre-cooling on two York condensers.
Project Profile: A Southwestern US Power Station installed MeeFog Systems on two SW 501FD2 gas turbines.
Case Study: Eagle Point Power Generation (EPPG) in Westville, NJ is a 225 MW combined-cycle facility with two GE Frame 7EA turbine generators.
Case Study: Midland Cogeneration Venture needed a cost-effective way to boost output at their facility. Mee Industries installed inlet air cooling..