Facebook Upgrades Outside Air Cooling System at Prineville Data Center
Case Study: Following the success of the MeeFog data center cooling system installation in 2011, we partnered with Facebook to further enhance efficiency and reduce maintenance.
Existing Customers Call 626-359-4550 Or Visit Customer Care
Case Study: Following the success of the MeeFog data center cooling system installation in 2011, we partnered with Facebook to further enhance efficiency and reduce maintenance.
Case Study: MOCA L.A. upgraded AHUs with a new MeeFog humidification system and building automation system to manage energy usage more efficiently
Project Profile: Learn about our custom pump rack solution with dual pumps and automated controls for optimized performance.
Project Profile: Discover how a Virginia microchip manufacturer improved clean room humidity control and mitigated electrostatic discharge with a custom-engineered MeeFog system.
Project Profile: Learn how a MeeFog humidification system and RO water treatment not only saves energy, but also creates better conditions for bioscience research projects.
Project Profile: Explore the MeeFog energy recovery system that delivers 15°F cooling while enhancing sustainability.
Case Study: Grand Valley State University strategically implemented a cost-effective MeeFog centralized humidification system to ensure optimal energy usage and preserve indoor air quality for its new four-story Business College building.
Case Study: Discover how Valparaiso University Library saves $40,000 annually in energy costs and preserves collections with MeeFog’s high-pressure humidification system.
Case Study: How Aileen S. Andrew Memorial Library implemented an energy-efficient humidification system to combat winter conditions and high humidifying loads.