GE 7EA Boosts Linden Cogen 6MW
Project Profile: Linden Cogen upgraded to a MeeFog System to replace an old fog system, saving on maintenance and gaining a 6 MW power boost.
Existing Customers Call 626-359-4550 Or Visit Customer Care
Project Profile: Linden Cogen upgraded to a MeeFog System to replace an old fog system, saving on maintenance and gaining a 6 MW power boost.
Project Profile: Provided a quick and reliable power solution to a remote location in the Sahara during extreme desert conditions.
Project Profile: Vistra, a Fortune 500 energy leader, enhances Texas’s energy capacity with advanced wet-compression technology for consistent high-performance power.
Project Profile: Mee Industries installed evaporative cooling systems to augment power production on six of their MHPS 501J …
Project Profile: The MeeFog systems provide fog evaporative cooling and wet compression for two GE 6561B gas turbines. Each system …
Case Study: MeeFog system creates the perfect growing environment
Case Study: Jamieson Ranch Vineyards noticed their old compressed air systems didn’t have nearly as many nozzles and had to run a lot longer the MeeFog system which distributes the mist far more evenly.
Case Study: Mobile-Mee disinfectant sprayer brings a safe and sanitary environment to Altadena Town & Country Club
Case Study: MeeFog sculpture welcomes visitors to new San Francisco Exploratorium