Las Vegas Cogen Slashes Cooling Costs and Boosts Output by 5 MW with MeeFog Technology
Case Study: In response to challenges posed by Las Vegas Nevada’s hot and dry climate, a GE LM6000-based peaker plant faces difficulties in maintaining optimal cooling during peak summer temperatures.