New York City Financial Institution Data Center Heat Rejection on Rooftop
Case Study: Evaporative pre-cooling to keep from having to shut down the data center during summer heatwaves.
Existing Customers Call 626-359-4550 Or Visit Customer Care
Come see us at GTF Expo in China! July 10 – 12, 2024
Case Study: Evaporative pre-cooling to keep from having to shut down the data center during summer heatwaves.
Case Study: A combined cycle power plant uses exhaust heat to make steam, the steam is run through a steam turbine…
Project Profile: A circuit board manufacturer in Mexico installed pre-cooling on two York condensers.
Project Profile: A Southwestern US Power Station installed MeeFog Systems on two SW 501FD2 gas turbines.
Case Study: Eagle Point Power Generation (EPPG) in Westville, NJ is a 225 MW combined-cycle facility with two GE Frame 7EA turbine.
Case Study: Midland Cogeneration Venture needed a cost-effective way to boost output at their facility. Mee Industries installed inlet air cooling..