Wet Compression Safely Delivers 14 MW in Two Minutes at Arizona Plant
Case Study: Onward Energy uses MeeFog wet compression technology to maximize GT output and combat Arizona’s intense summer heat
Existing Customers Call 626-359-4550 Or Visit Customer Care
Case Study: Onward Energy uses MeeFog wet compression technology to maximize GT output and combat Arizona’s intense summer heat
Project Profile: MeeFog’s wet compression systems enhances power output by 28 MW for two GE 7F.03 turbines, achieving exceptional results without blade erosion after four summer seasons.
Case Study: How the Tuxpan Power Plant in Mexico leveraged MeeFog Wet Compression to enhance gas turbine efficiency, significantly increasing power output while maintaining turbine integrity and reducing operational costs.
Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet compression technology, enhancing efficiency while reducing NOx emissions by 7 ppm.
Case Study: To capitalize on new market opportunities arising from energy regulations in Mexico, the Tuxpan III & IV Combined Cycle Power Plant aimed to maximize its power output.
Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of Durango, Mexico.
Project Profile: A power station in Mexico installed two MeeFog systems on a Siemens Westinghouse W501FC gas turbine.
Project Profile: In 2023, three MeeFog wet compression systems were installed on three GE 7EA gas turbines.
Project Profile: A Vietnamese power company needed a cost-effective way to boost output at their facility.