MOCA Los Angeles Enhances Art Preservation with MeeFog Humidification
Case Study: MOCA L.A. upgraded AHUs with a new MeeFog humidification system and building automation system to manage energy usage more efficiently
Existing Customers Call 626-359-4550 Or Visit Customer Care
Case Study: MOCA L.A. upgraded AHUs with a new MeeFog humidification system and building automation system to manage energy usage more efficiently
Case Study: Discover how Valparaiso University Library saves $40,000 annually in energy costs and preserves collections with MeeFog’s high-pressure humidification system.
Case Study: How Aileen S. Andrew Memorial Library implemented an energy-efficient humidification system to combat winter conditions and high humidifying loads.
Case Study: Providing precise environmental control for the Smithsonian’s 360,000 sqft facility, requiring stringent environmental controls to ensure the preservation of priceless artifacts.
Case Study: Read how HUD achieved substantial energy savings and enhanced air quality by switching from steam to MeeFog high-pressure fogging systems.
Case Study: Originally, Alliant Energy headquarters was conditioned by seven air handlers using electric steam humidifiers. After choosing to go green, Alliant switched to MeeFog.
Case Study: The main NCMA building was built in 1982. It is a four-story, 171,870 square foot building that includes exhibit space, restaurant and offices. The museum is occupied 7 days a week.
Case Study: Humidifiers preserve modern art collection.