Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Come see us at GTF Expo in China!   July 10 – 12, 2024

Clean Rooms

Energy-Efficient Humidification for Connor-Winfield’s New Cleanroom Facility

Case Study: Discover how MeeFog’s high-pressure humidification systems achieve a cost savings of $35k annually for a manufacturer of quartz based timing circuits and oscillators.

Pall Life Sciences Enhances Clean Room Efficiency

Case Study: Discover how Pall Life Sciences achieved energy-efficient humidity control in their clean room manufacturing space with MeeFog’s high-pressure humidification systems.

Danfoss factory featuring Meefog Systems' controlled relative humidity systems to reduce energy levels.

Danfoss PAHT Pump Cuts Electrostatic Discharges and Energy Costs at Illinois Electronics Plant

Case Study: At the Danfoss factory is in Loves Park, Illinois midwestern winters keep average temperatures below freezing five months a year. So controlling relative humidity to prevent electrostatic discharges (ESD) is vital.

Clean Rooms: Army Research Laboratory Uses CHP and MeeFog Humidification to Cut Energy and O&M Costs

Case Study: The Army Research Laboratory in Adelphi, Maryland had been using a boiler to provide hot water as well as steam humidification…