Victoria Texas 501F Generates 24 MW Boost M501F GT
Gas Turbine Wet CompressionGas Turbine Inlet Air Fogging – Victoria, Texas
The MeeFog system provides wet compression downstream of an existing evaporative cooler for the M501F gas turbine. The Meefog skid has six pumps and provides six stages of fogging. Each stage produces a 4 MW power boost, resulting in a 24 MW total power boost.
Project Conditions:
Location: Victoria, Texas
Model: M501F Gas Turbine
Hot day conditions: 97° F with 76° wet bulb
Elevation: 118 feet
Mee’s scope of work: Turnkey, excluding control mods
Fog System Design:
Cooling Stages: 6
Operating Pressure: 2,000 psi
Fog Droplet Size: 12 microns (D32)
MeeFog™ Nozzle Count: 1,950
Nozzle Flow Rate: 0.080 gpm per nozzle
Max. Skid Water Flow: 156 gpm
Max. Power Requirement: 6 x 50 HP