Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Three MW Power Boost on LM 6000 in Mexico with MeeFog

Procter & Gamble in Mexico installed a MeeFog evaporative cooling system in their LM 6000 gas turbine in 2006. In 2013 they expanded their system by adding another pump and additional nozzles. The Meefog skid has two pumps and provides five stages of fogging, producing a 3 MW power boost.

Project Conditions:

Location: Apizaco Tlaxcala, Mexico
Hot day conditions: 23.3° C with 14.5° C wet bulb
Elevation: 2,444 meters above sea level
Mee’s scope of work: Supervision during installation and commissioning
Max power boost per GT: 3 MW

Fog System Design:

Fogging stages: 5
Operating pressure: 2,000 psi
Fog droplet size: 12 microns
Nozzle flow rate: 0.17 lpm per nozzle
MeeFog nozzle count: 260
Pump skid power: 20 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Exterior of Watson Cogeneration Plant (WCP) during sunset

Watson Cogeneration Boosts Output by 10 MW with MeeFog Wet Compression System

Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet comp...

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

Case Study: To capitalize on new market opportunities arising from energy regulations in Mexico, the Tuxpan III......

Boost of 28 MW on two Siemens SGT-5000FD2 GTs Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of......