PetroVietnam Power Achieves 30 MW Boost on Two GT13E2 Turbines

PetroVietnam Power facility with two GE Alstom GT13E2 gas turbines equipped with MeeFog systems

PetroVietnam Power enhanced the performance on two GE Alstom GT13E2 gas turbines by installing MeeFog systems. These advanced systems provide fog evaporative cooling and wet compression, utilizing skids with sixteen pumps and sixteen stages of fogging each. They deliver a 15 MW power boost, resulting in a total power boost of 30 MW for both units. The improved efficiency and output demonstrate the substantial benefits of MeeFog systems for large-scale power generation.

Project Conditions:

Location: Nhon Trach, Vietnam
Hot day conditions: 32.6 °C / 48% RH with 23.8 °C wet bulb
Elevation: Sea Level
Max power boost per GT: 15 MW
Mee’s scope of work: Supply of fog pump skid, nozzle manifolds, and supervision of installation and commissioning.

Fog System Design:

Cooling Stages: 16 (evaporative cooling and 0.6% wet compression)
Operating Pressure: 2,000 psi
Fog Droplet Size: 12 micron
MeeFog™ Nozzle Count: 2,048
Nozzle Flow Rate: 0.17 lpm per nozzle
Max. Water Flow: 348.2 lpm
Max. Power Requirement: 160 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

Case Study: Tuxpan III & IV Combined Cycle Power Plant needed to maximize its power output to......

Power Output Boost of 28 MW Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of......

32 MW Power Boost On a Siemens Westinghouse W501FC

Project Profile: A power station in Mexico installed two MeeFog systems on a Siemens Westinghouse W501FC gas......