PetroVietnam Power Achieves 30 MW Boost on Two GT13E2 Turbines

  • Blue gradient city outlined in white to show wet compression for gas turbines
PetroVietnam Power facility with two GE Alstom GT13E2 gas turbines equipped with MeeFog systems

PetroVietnam Power enhanced the performance on two GE Alstom GT13E2 gas turbines with MeeFog. These advanced MeeFog systems provide fog evaporative cooling and wet compression, utilizing skids with sixteen pumps and sixteen stages of fogging each. They deliver a 15 MW power boost, resulting in a total power boost of 30 MW for both units. The improved efficiency and output demonstrate the substantial benefits of MeeFog systems for large-scale power generation.

Project Conditions:

Location: Nhon Trach, Vietnam
Hot day conditions: 32.6 °C / 48% RH with 23.8 °C wet bulb
Elevation: Sea Level
Max power boost per GT: 15 MW
Mee’s scope of work: Supply of fog pump skid, nozzle manifolds, and supervision of installation and commissioning.

Fog System Design:

Cooling Stages: 16 (evaporative cooling and 0.6% wet compression)
Operating Pressure: 2,000 psi
Fog Droplet Size: 12 micron
MeeFog™ Nozzle Count: 2,048
Nozzle Flow Rate: 0.17 lpm per nozzle
Max. Water Flow: 348.2 lpm
Max. Power Requirement: 160 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Wet Compression Safely Delivers 14 MW in Two Minutes at Arizona Plant

Case Study: Onward Energy uses MeeFog wet compression technology to maximize GT output and combat Arizona’s intens...

Wet Compression Boosts Power Output by 28 MW

Project Profile: MeeFog’s wet compression systems enhances power output by 28 MW for two GE 7F.03 turbines,......

Maximizing Power Output with MeeFog Systems at Tuxpan Power Plant, Mexico

Case Study: How the Tuxpan Power Plant in Mexico leveraged MeeFog Wet Compression to enhance gas turbine......