Evaporative Cooling & Wet Compression Boosts Power Output by 30 MW

  • Blue gradient city outlined in white to show wet compression for gas turbines

In 2012, MeeFog evaporative cooling and wet compression systems were installed on two Alstom 13E2 gas turbines. Wet compression consists of spraying water into the gas turbine compressor. The water evaporates inside the compressor giving an inter-cooling effect that reduces the work of compression, which causes an increase in power output. Each MeeFog system installed has 16 stages of cooling and provides a 15 MW power boost resulting in a total 30 MW power boost for the plant.

Project Conditions:

 

  •  Model: Alstom 13E2
  • Elevation: Sea Level
  • Mee’s scope of work: design, build, supervise installation
  • Max power boost per GT: 15 MW
  • Evaporative Cooling & Wet compression

Fog System Design:

 

  • Fogging Stages: 16
  • Operating Pressure: 2,000 psi
  • Fog Droplet Size: 19 micron (D v90)
  • MeeFog™ Nozzle Count: 2,048
  • Nozzle Flow Rate: 0.17 lpm per nozzle
  • Max. Water Flow: 348.2 lpm
  • Max. Power Requirement: 119.4 kW

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Exterior of Watson Cogeneration Plant (WCP) during sunset

Watson Cogeneration Boosts Output by 10 MW with MeeFog Wet Compression System

Case Study: Learn how Watson Cogeneration increased power production by 10 MW using MeeFog’s advanced wet comp...

MeeFog Adds 64MW of Power Augmentation to Mexican Power Plant

Case Study: To capitalize on new market opportunities arising from energy regulations in Mexico, the Tuxpan III......

Boost of 28 MW on two Siemens SGT-5000FD2 GTs Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of......