Inlet Cooling & Wet Compression Boosts Power Output by 20 MW

In 2000, MeeFog systems were installed on two Siemans V64.3 gas turbines. These systems offer both inlet cooling and wet compression. Wet compression consists of spraying water into the gas turbine compressor. The water evaporates inside the compressor giving an inter-cooling effect that reduces the work of compression, which causes an increase in power output. Each system provides a 10 MW power boost resulting in a 20 MW boost for the plant. This customer continues to get maximum output with MeeFog whenever additional load is required.

Project Conditions:

  • Model: Siemans V64.3
  • Hot day conditions: 101.3° F with 83.5° wet bulb
  • Elevation: Sea Level
  • Mee’s scope of work: design, build, supervise installation
  • Max power boost per GT: 10 MW

Fog System Design:

  • Fogging Stages: 9
  • Operating Pressure: 2,000 psi
  • Fog Droplet Size: 14 microns
  • MeeFog Nozzle Count: 648
  • Nozzle Flow Rate: 0.17 lpm per nozzle
  • Max. Water Flow: 110.2 lpm
  • Max. Power Requirement: 45 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Instant 1 MW Power Boost for Offshore Gas Re-Injection Well

Project Profile: A strategic upgrade on a Rolls Royce RB211 marine gas turbine resulted in a substantial......

Vietnam’s Largest Power Plant Gains 60 MWs with MeeFog Cooling System

Project Profile: Learn about the custom-engineered solution that enhances gas turbine performance under extreme cond...

20 MW of Power Recovery at Load-Following Power Plant

Case Study: Faced with the challenge of maintaining optimal power output as equipment aged and temperatures rose,......