32 MW Power Boost On a Siemens Westinghouse W501FC

A power station in Mexico installed two MeeFog systems on a Siemens Westinghouse W501FC gas turbine. These systems provide fog evaporative cooling and wet compression. The skids have six pumps and twenty-four stages of fogging. They produce a 32 MW power boost total, demonstrating the efficiency and performance benefits of MeeFog technology.

Project Conditions:

Location: Sonora, Mexico
Model: SW501FC
Elevation: 244 m ASL
Max Power Boost: 32 MW
Mee’s scope of work: Supply of fog pump skid, nozzle manifolds, supervision of installation and commissioning.

Fog System Design:

Cooling Capacity: 26.9°C + 0.4% wet compression
MeeFog™ nozzle count: 2,376
Operating Pressure: 2,000 psi
Nozzle flow rate: 0.17 lpm (0.045 gpm)
Total Skid Flow: 404 lpm (107 gpm)
Max Power Requirement: 180 hp
Cooling Stages: 24 stages, 1.56 °C (2.8 °F) per stage

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

Power Output Boost of 28 MW Using Wet Compression

Project Profile: MeeFog wet compression systems fitted onto two Siemens SGT-5000FD2 gas turbines in the state of......

Wet Compression Boosts Power Output by 24 MW

Project Profile: In 2023, three MeeFog wet compression systems were installed on three GE 7EA gas turbines....

Evaporative Cooling & Wet Compression Boosts Power Output by 30 MW

Project Profile: A Vietnamese power company needed a cost-effective way to boost output at their facility....