Skip to content

Existing Customers Call 626-359-4550 Or Visit Customer Care

Come see us at GTF Expo in China!   July 10 – 12, 2024

GE 7EA Gas Turbine

Linden Cogen installed a MeeFog System to replace an old high-maintenance fog system supplied several years ago by a different company. Linden Cogen found they were spending too much time and money on the previous system. They were so impressed by the performance of the new MeeFog System that they purchased another one the following year. MeeFog Systems are equipped with water-lubricated pumps that do not require oil or drive belt replacement. They are easy to maintain and perform efficiently even after decades of use.

Project Conditions:

Location: Linden, New Jersey
Hot day conditions: 93° F with 75° F wet bulb
Model: GE 7EA Gas Turbine
Elevation: 50 feet ASL
Mee’s scope of work: Design, Build, and Install
Max power boost per GT: 6 MW
Degrees of Cooling per GT: 24° F

Fog System Design:

Evaporative cooling system
Cooling stages: 8
Operating pressure: 2,000 psi
Fog Droplet Size: 19 Micron (DV 90)
Nozzle Flow Rate: 0.045 gpm per nozzle
MeeFog™ Nozzle Count: 560
Max. Water Flow: 25.2 gpm
Max. Power Requirement: 2×20 HP

Learn More

Want to learn more about successful Meefog systems installation projects and case studies?

Other Related Blog Articles

How a Southern California Refinery Mastered Power Generation and Cooling with MeeFog Technology

Case Study: Discover how we efficiently increased power generation while adhering to strict emissions regulations at...

Slashing Chiller Costs With Inlet Fog in Nevada

Case Study: A GE LM6000 based peaker plant in Nevada faces challenges maintaining optimal cooling during peak......

MeeFog System Enhances Power, Cuts Fuel Usage, and Reduces Emissions at Chinese Compressor Station

Case Study: PetroChina enhances natural gas output, meets demand, and reduces emissions with a MeeFog system install...