GE 7EA Boosts Linden Cogen 6MW
Gas Turbine Inlet Air Cooling![GE 7EA Gas Turbine](https://www.meefog.com/wp-content/uploads/MeeFog-evaporative-cooling-system.png)
Linden Cogen installed a MeeFog System to replace an old high-maintenance fog system supplied several years ago by a different company. Linden Cogen found they were spending too much time and money on the previous system. They were so impressed by the performance of the new MeeFog System that they purchased another one the following year. MeeFog Systems are equipped with water-lubricated pumps that do not require oil or drive belt replacement. They are easy to maintain and perform efficiently even after decades of use.
Project Conditions:
Location: Linden, New Jersey
Hot day conditions: 93° F with 75° F wet bulb
Model: GE 7EA Gas Turbine
Elevation: 50 feet ASL
Mee’s scope of work: Design, Build, and Install
Max power boost per GT: 6 MW
Degrees of Cooling per GT: 24° F
Fog System Design:
Evaporative cooling system
Cooling stages: 8
Operating pressure: 2,000 psi
Fog Droplet Size: 19 Micron (DV 90)
Nozzle Flow Rate: 0.045 gpm per nozzle
MeeFog™ Nozzle Count: 560
Max. Water Flow: 25.2 gpm
Max. Power Requirement: 2×20 HP
Learn More
Want to learn more about successful Meefog systems installation projects and case studies?