A circuit board manufacturer in Mexico installed pre-cooling on two York condensers. According to the plant engineer the system paid for itself in 16 months, giving them about $100K in energy savings per year going forward. The system provides 16 °F of cooling (8.9 °C) for the two condensers.

Project Conditions:

Location: Mexico

Mee’s scope of work: Supply of fog pump, nozzle manifolds, reverse osmosis unit, installation, and startup.

Fog System Design:

Nozzle count: 338 x 2 located under condenser coils
Cooling capacity: 16 °F
Max gpm/hp: 20 gpm @ 15 hp
Stages: VFD control
Air Flow per unit: 400,000 CFM

 

Learn More About Meefog Systems

Read about the benefits of Meefog’s Fog Cooling System from previous successful installations:

Other Related Blog Articles

MeeFog System Boosts Air Compressor Output at Fertilizer Plant

Case Study: Simplot’s Fertilizer Plant uses MeeFog technology to improve its ammonia production process, making it...

NYC Financial Institution Prevents Heat-Related Shutdowns with MeeFog System

Case Study: Evaporative pre-cooling to keep from having to shut down the data center during summer heatwaves....